In August 2022 the grand staircase was started. With a return half way down, the handrail, newell, balusters, risers and treads will be installed towards the end of the build. These are made from Texan oak, and are already on site.
During November 2021 the major job of plasterboarding began, showing a big change in how the rooms will eventually look.