Bathrooms
Work still carries on whilst beaurocracy grinds away. It was an ideal time to start work on the bathrooms. The slate floor tiles were...
Work still carries on whilst beaurocracy grinds away. It was an ideal time to start work on the bathrooms. The slate floor tiles were...
With the delay incurred by the installations of the water and sewer connections, works couldn't commence for the kitchen and garage...
One of the longest and delayed projects so far at Arnsheen, was the connection of the building to mains water and sewer supplies. The...
In December 2021 work started on the pipework for the plumbing. With the help of a friend, plastic piping was used initially, but it was...
In August 2022 the grand staircase was started. With a return half way down, the handrail, newell, balusters, risers and treads will be...
Its been a while since we posted a new blog, but whilst a lot of things have been happening there have been long delays and frustrations...
Approximately five months after purchasing the property, clearing the site and demolishing the interior and the rear vestry, I had a...
In June 2020 the first of two new architectural features was added to the building.This was a doorway opening from the first floor in the...
The slate floor was laid over the screed, in just the nave for now. The first phase had a protection cover of sheeting and then the...
The chosen supplier for the underfloor heating also designed the zone plans for the pipes layout for each area: downstairs rooms (nave),...
Nearly all of the stained glass windows in the church had been vandalised, apart from the 3 large ones in the west transept, which were...
When I purchased the church, the clock was still in the tower. However, there was no way to check the condition of the clock works. Most...
The existing stained glass windows (37 total) were all damaged by vandals. These stained glass panels were set into the stone jambs with...
I have constructed a stone wall along Main Street, adjacent to Arnsheen property. Columns were built first using cut sandstone, total of...
The original front door of the church was a wooden bi-parting sliding door, which was no longer in working order. There were 2" gaps...
In the church tower at the level of the large round top windows was the church bell. It was cast in 1887, by a bell foundry in Glasgow,...
The existing wooden floor in the church had rotted due to missing window glass. All the windows had been vandalized over the years. My...
After the clearing of the site, the old vestry had to be removed. The flat roof section of the vestry had fallen in causing the remaining...
The site was completely overgrown and cluttered with debris. I hired a local farmer with a tractor backhoe to clear and remove the...
In 2017 a search began to find an old church in the southwest of Scotland. Several possibilities were found and a wish list of...