Work still carries on whilst beaurocracy grinds away. It was an ideal time to start work on the bathrooms. The slate floor tiles were...

Kitchen and Garage Extension

With the delay incurred by the installations of the water and sewer connections, works couldn't commence for the kitchen and garage...

Mains Water and Sewer - the great saga!

One of the longest and delayed projects so far at Arnsheen, was the connection of the building to mains water and sewer supplies. The...

The Grand Staircase & Plaster-Boarding

In August 2022 the grand staircase was started. With a return half way down, the handrail, newell, balusters, risers and treads will be...

The Battle of Utilities Suppliers

Approximately five months after purchasing the property, clearing the site and demolishing the interior and the rear vestry, I had a...

TheFeature Fireplace and a New Doorway

In June 2020 the first of two new architectural features was added to the building.This was a doorway opening from the first floor in the...

Bedrooms, Master Bedroom, and a forest of timbers

The slate floor was laid over the screed, in just the nave for now. The first phase had a protection cover of sheeting and then the...

Underfloor heating, and slate floor

The chosen supplier for the underfloor heating also designed the zone plans for the pipes layout for each area: downstairs rooms (nave),...

Stained Glass Windows

Nearly all of the stained glass windows in the church had been vandalised, apart from the 3 large ones in the west transept, which were...

The Story of the Clock

When I purchased the church, the clock was still in the tower. However, there was no way to check the condition of the clock works. Most...

New windows, what a journey

The existing stained glass windows (37 total) were all damaged by vandals. These stained glass panels were set into the stone jambs with...

The Great Wall of Barrhill

I have constructed a stone wall along Main Street, adjacent to Arnsheen property. Columns were built first using cut sandstone, total of...

New Oak Front Door

The original front door of the church was a wooden bi-parting sliding door, which was no longer in working order. There were 2" gaps...

The Story of the Bell

In the church tower at the level of the large round top windows was the church bell. It was cast in 1887, by a bell foundry in Glasgow,...

Demolition of Vestry

After the clearing of the site, the old vestry had to be removed. The flat roof section of the vestry had fallen in causing the remaining...

First Job- Clearing The Site

The site was completely overgrown and cluttered with debris. I hired a local farmer with a tractor backhoe to clear and remove the...

In The Beginning

In 2017 a search began to find an old church in the southwest of Scotland. Several possibilities were found and a wish list of...